Commercial
Bozard Lincoln Dealership
This project consisted of a 65,000 sf renovation to an existing building. The project consisted of removal of existing concrete tilt panels, new foundations and structural steel, incorporating a second floor for administrative space, completely new mechanical, electrical, plumbing and fire sprinkler services, high end interior flooring and woodwork, granite water feature, recessed Italian showroom lighting, exterior bi-fold doors for runway display, 4 sales pavilions, 1 black label sales area, a Lincoln delivery suite, sales desks, 2 service write-up offices and a concierge desk.
To play, press and hold the enter key. To stop, release the enter key.
Bozard Ford West
Bozard Ford West is an area located inside of the Bozard Ford Dealership that formerly housed Bozard executives. Once the executives were relocated to the new Lincoln Dealership, this area was renovated to become the new Commercial Sales Area. It includes offices, a breakroom and a lobby for clients waiting on vehicle service.
To play, press and hold the enter key. To stop, release the enter key.
Bozard Service Write-Up
This project was a renovation to the existing service write-up area at Bozard Ford in St. Augustine. The work consisted of new interior walls, new flooring, casework with quartz countertops and a retail display area, an interior glass wall system along with storefronts and automatic doors and new fire sprinkler and electrical systems.
To play, press and hold the enter key. To stop, release the enter key.
Bozard Ford 12-Bay Quicklane
The Bozard Ford Quicklane is a 12,000 SF, 12-Bay automotive service center constructed with a CMU Split Face shell and a TPO Membrane roof over metal deck and structural steel. The building was built on a site that utilized all available space with building area and asphalt paving so it made for logistical constraints throughout the construction of the project. In addition, the project is located adjacent to major retailers and the existing operational Ford dealership. STG had to consider all of our surroundings when constructing the project insuring traffic flow and shoppers were not inconvenienced due to our project. Temporary measures were put in place to conceal the project from the public eye as well as keep them safe with our day to day operations. The project obtained a certificate of occupancy within a little over 4 months from the notice to proceed.
To play, press and hold the enter key. To stop, release the enter key.
Detail Building at Bozard Ford Lincoln
This new, ground-up project was built to take the place of the existing vehicle detailing area and is able to accommodate a larger volume of vehicles. The building is closed-in and conditioned unlike the previous detailing area. The project included overhead doors, air and vacuum systems, high-speed ceiling fans and wash bay curtains.
To play, press and hold the enter key. To stop, release the enter key.
Caliber Collision
​Caliber Collision, located in Jacksonville, FL was a brand new facility on Philips Highway. The interior included a shop and paint booth, offices, restrooms and breakroom.
To play, press and hold the enter key. To stop, release the enter key.
American Tire
The American Tire Distributors project included a 50,000 SF expansion to an existing 80,000 SF tire distribution center. STG worked with the design team to efficiently evaluate the constructability of the new building tie-in to the existing facility. These efforts allowed STG to fully construct the new addition without impacting the tenant’s daily operations. Once the expansion was complete, new doorways were cut in and the facility became fully functional. The project also included upgrading the existing fire sprinkler system, adding a fire pump, new lighting throughout the existing space, along with additional cosmetic upgrades such as painting the existing facility and replacing the dock bay canopies.
To play, press and hold the enter key. To stop, release the enter key.
Orange Park Medical Center
The Orange Park Medical Center, located in Fleming Island was a 10,400 square foot interior build-out constructed for a multispecialty medical practice. The interior space consisted of fifteen medical exam rooms, one procedure room, an X-ray room, two waiting rooms, and numerous offices, admin storage space and a medicine lab. The construction was completed in 120 days from the Notice to Proceed date to Substantial Completion.
To play, press and hold the enter key. To stop, release the enter key.
FL East Coast Railway
This project was a total renovation of an 8,576 sf warehouse originally built in 1928 as a locomotive maintenance and repair shop. The facility was constructed into a contemporary corporate office for the employees of Florida East Coast Railway. The transformation included removal of the building’s overhead doors and replacing them with insulated high-performance glazing in an aluminum curtainwall system and installing a new concrete slab. The facility now includes work stations for 180 employees along with eight enclosed offices, an ornate breakroom area, conference room and employee restrooms.